- SUE "Maxsustrans" was established in 1988.
- In Tashkent, there are 12 vehicle points where 531 units of special equipment have been assembled: garbage trucks (477 units), dump trucks, and container trucks.
- The number of employees is almost 1,500 people.
- 750 equipped waste collection sites and 65 waste collection modules have been installed in the city.
- There are three transshipment stations in operation.
- The average annual volume of waste removal is 1.71 million cubic meters or 686 thousand tons.
- Depending on the season, 1,800-2000 tons of waste are removed per day.
- Every year, the volume of waste generated by Tashkent residents increases by 5-7%.
Waste collection and removal are carried out by the State Unitary Enterprise "Maxsustrans" (share 70%) and alternative private waste removal companies (share 30%).
- Over the past year, new equipment was purchased through a loan from the Asian Development Bank, Tashkent's mahallas were inventoried, waste disposal sites were restored, new containers with a capacity of 770 and 1,100 liters were installed, and modern waste collection modules were created.
- 59 units of specialized equipment have been purchased.
- By 2028, waste processing plants will be built outside the city, where 60% of waste will be recycled.